Skip to content
Snippets Groups Projects

add alternative battery installation method

Closed prk0 ghy requested to merge prk0ghy/flow3r-firmware:main into main
1 unresolved thread

Merge request reports

Loading
Loading

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
61 61 Route the cable through the notch on the PCB to the back of the board, where the
62 62 battery will live.
63 63
64 Option A Direct Attachment:
  • Maintainer

    Merged in b4e49997

  • closed

  • Please register or sign in to reply
    Loading